Concrete pump is equipped with high pressure clean equipment, which can be cleaned quickly and conveniently. Self-lubrication in bucket and cylinder. America PARKER seal parts, very thick chromium coat inside cylinder which makes sure 20,000m3 concrete output. High low pressure conversion valve with patent, reduce the pressure on main hydraulic system and improve system efficiency with 20%.

The followings are the performance characteristics of concrete pump:

1. Triple pump system. There is no mutual interference between hydraulic circuits and system runs normally.

2. Anti-pumping function. It is beneficial to eliminate the fault of pipe plugging in time and stop to feed materials in a short time.

3. Advanced S-pipe distribution valve. It can compensate the wear clearance automatically has good sealing performance.

4. Adopted with wear-resistance alloy materials, the glass-like plate and floating cutting ring have long longevity.

5. Long stroke material cylinder can prolong the service life of material cylinder and piston.

6. Optimized design hopper is easy to clean and it has a better material absorption performance.

7. Lubricating system is centralized automatically which can ensure the machine is effectively lubricated during the operation.

8. The remote control function makes the operation more safe and convenient.

9. All accessories which conform to national standards have a better interchangeability.

The pouring order should meet the following requirements:

1. The pouring should be from far to near when users deliver concrete with pipeline.

2. When delivering concrete in same area, the concrete pump adopts the layered continuous pouring, which is from vertical structure to horizontal structure.

3. When it is not allowed to have construction joints, concreting intermission time between regions and the upper and lower levels should not exceed the initial setting time of concrete.

4. After the initial setting time of the lower level concrete, users should deal with according to the regulation of construction joints when they pour the upper level concrete.

5. It is necessary to divide well the concrete pouring regions in advance according to features of engineering structure, plane shape, geometry size, ability of concrete supply and pumping equipment, labor force, management ability and size of surrounding area.

making a brick making machine

reay mix concrete mixing station

ready mix concrete plant

ash brick machine price

Performance Characteristics and Pouring Order of Concrete Pump
Do you want to know more about the product ?
Latest News
More
Mar 17, 2015
Fully automatic concrete mixing plant well reduces labor amount in construction project, and more humanized designs are added in terms of using this kind of concrete mixing plant. Then, how do we rightly operate fully automatic concrete mixing plant? Which requirements should be met for operators? The so-called full automation of concrete mixing plant means that all devices such as transporting system, batching system, mixing system and discharging system can be controlled by a computer. First of all, aggregate concrete batching is transported by belt conveyor. The pump and fly ash are transmitted by screw conveyor to be weighed. Then, in the operation process of fully automatic concrete mixing plant, water and additives are weighed by electric scale. All needed concrete materials are weighed by electric scale and made a ratio according to design process. The main concrete mixer is adjusted according the materials. When production combination starts and the materials are mixed evenly,
Jan 13, 2015
Currently, the strength of common used concrete is 20一40 n/mm. It is not difficult to produce the concrete of 80一100 N/mm if necessary. In order to lighten self-weight, concrete with light weight but high strength gets big development. Due to the continuous improvement of material strength, the application scope reinforced concrete and prestressed concrete is expanding. In recent 30 years, reinforced concrete and prestressed concrete have achieved remarkable development in long-span structure and high-rise building structure. For instance, Germany builds a roof beam of hangar with scope of 90m by adopting prestressed lightweight concrete; the scope of bridge in Japan reaches 239 m. During this period, design theory also has new development. Since the 1970s, structural reliability theory has gradually stepped into the stage of engineering practical on the basis of mathematical statistics, which makes the limit design method more improved and scientific. In the meantime, structure
Related Products
More
Services
Product quality is life, and considerate services are motive power. We are committed to providing timely, rapid, and efficient services for each of our customers.
About HAMAC
HAMAC can provide you with the consulting service, export agent service, Chinese product searching service and so on. Hope we can have a long-term cooperation and build a good relationship in the future.
Innovation
If you are interested in our company or products, welcome to visit our company or local offices; you can also get contact with us through online consulting, demand table submission, e-mails and telephones. Our staff shall wholeheartedly provide product information, application knowledge and good service for you.
A world leader in concrete machinery and Batching equipment in the construction industry
Copyright © 1981-2020 Zhengzhou Hamac Automation Equipment Co., Ltd.
Online
Email
Submit